The mark opens its own file — trademark/ sub-project with the LANEWORK clearance record

Knockout search completed 2026-08-07, clear to file 1(b) Class 9; one yellow flag (WORKLANE, SN 99594941) with its 2027-02-04 watch date.

Claude-Session: https://claude.ai/code/session_014PtZdPwqZuqEDLc6wZMtEy
This commit is contained in:
2026-08-08 10:05:31 -04:00
parent 4eabcbbe30
commit 41e715e9b1
2 changed files with 84 additions and 0 deletions
+25
View File
@@ -0,0 +1,25 @@
# Trademark — LANEWORK Registration
USPTO trademark registration for the LANEWORK word mark, tracked as a sub-project over multiple sessions: clearance, filing, prosecution, and post-registration maintenance. Sibling to `strategy/` (the mark protects the brand that strategy work builds on); same document conventions — each document opens with a scope note and a dated line, prose is unwrapped, one line per paragraph or list item.
## Status
**Phase: cleared, not yet filed.** Knockout clearance completed 2026-08-07 with a clear-to-file verdict and one yellow flag (WORKLANE, a transposed-mark ITU application in adjacent goods — see 01-clearance.md).
## Next actions
- Settle the owning entity (individual vs LLC) — must be decided before filing; intent-to-use applications cannot be freely assigned later.
- Optional: one-hour attorney consult (~$5001,500) focused on the WORKLANE citation risk and identification wording; filing pro se remains defensible.
- File the Section 1(b) intent-to-use application: standard-character word mark LANEWORK, Class 9 only, ID Manual-based identification, $350 (see 01-clearance.md ▸ Filing plan for exact wording constraints).
- After App Store launch: file the Statement of Use with the listing as specimen ($150).
## Watch dates
- **2027-02-04** — WORKLANE (SN 99594941) Statement of Use deadline; check [TSDR](https://tsdr.uspto.gov/statusview/sn99594941) then and at each subsequent six-month extension (extendable to ~2029-08). If the ITU lapses, the only cloud on LANEWORK clears entirely.
- After registration: Section 8/15 declaration window at years 56; renewal every 10 years.
## Documents
- [01-clearance.md](01-clearance.md) — the 2026-08-07 knockout search record: queries run, conflict screen results, the WORKLANE analysis, the crowded-field argument, and the filing plan (start here)
Documents are added as the sub-project progresses, numbered in sequence: filing record, office-action responses, registration, maintenance.