The plan closes its own loop — executed 2026-08-08, steps 1 through 8, each committed green
Step 8's verification record: 2,707 unit tests green at close (the golden fixture suite among them, untouched — no git fixtures ever existed); the UI test targets compile; the keeper behaviors — a board beside a real .git opened, watched, and healed byte-identically — are pinned by GitAgnosticStorageTests, FolderWatcherTests, and the gitignore/relocation suites, all green. The accessibility audit could not run to a verdict in this environment (its AX sweep flagged another app's fullscreen video element — the same failure on surfaces the excision never touched); the popover audit's own screenshot shows the strip as ruled: Info, Theme, Sync. Claude-Session: https://claude.ai/code/session_014PtZdPwqZuqEDLc6wZMtEy
This commit is contained in:
+1
-1
@@ -5,7 +5,7 @@ Long-term strategy work for Lanework's release, distribution, and business model
|
||||
## Documents
|
||||
|
||||
- [00-charter.md](00-charter.md) — the framing document: strategic goal, the two tier anchors, what is already ruled, the decision surface, the tensions to resolve, and the research agenda (start here)
|
||||
- [01-git-excision.md](01-git-excision.md) — **ruled 2026-08-08: excise** — the plan for removing app-managed git entirely: keepers, harvest, delete list, sequencing, deferred successors, handoff
|
||||
- [01-git-excision.md](01-git-excision.md) — **ruled and executed 2026-08-08** — the plan for removing app-managed git entirely: keepers, harvest, delete list, sequencing, deferred successors; the stack is out, resurrection point at tag `pre-git-excision`
|
||||
|
||||
Workstream documents are added as they happen, numbered in sequence.
|
||||
|
||||
|
||||
Reference in New Issue
Block a user