Files
lanework/trademark/README.md
T
rzen 41e715e9b1 The mark opens its own file — trademark/ sub-project with the LANEWORK clearance record
Knockout search completed 2026-08-07, clear to file 1(b) Class 9; one yellow flag (WORKLANE, SN 99594941) with its 2027-02-04 watch date.

Claude-Session: https://claude.ai/code/session_014PtZdPwqZuqEDLc6wZMtEy
2026-08-08 10:05:31 -04:00

26 lines
2.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Trademark — LANEWORK Registration
USPTO trademark registration for the LANEWORK word mark, tracked as a sub-project over multiple sessions: clearance, filing, prosecution, and post-registration maintenance. Sibling to `strategy/` (the mark protects the brand that strategy work builds on); same document conventions — each document opens with a scope note and a dated line, prose is unwrapped, one line per paragraph or list item.
## Status
**Phase: cleared, not yet filed.** Knockout clearance completed 2026-08-07 with a clear-to-file verdict and one yellow flag (WORKLANE, a transposed-mark ITU application in adjacent goods — see 01-clearance.md).
## Next actions
- Settle the owning entity (individual vs LLC) — must be decided before filing; intent-to-use applications cannot be freely assigned later.
- Optional: one-hour attorney consult (~$5001,500) focused on the WORKLANE citation risk and identification wording; filing pro se remains defensible.
- File the Section 1(b) intent-to-use application: standard-character word mark LANEWORK, Class 9 only, ID Manual-based identification, $350 (see 01-clearance.md ▸ Filing plan for exact wording constraints).
- After App Store launch: file the Statement of Use with the listing as specimen ($150).
## Watch dates
- **2027-02-04** — WORKLANE (SN 99594941) Statement of Use deadline; check [TSDR](https://tsdr.uspto.gov/statusview/sn99594941) then and at each subsequent six-month extension (extendable to ~2029-08). If the ITU lapses, the only cloud on LANEWORK clears entirely.
- After registration: Section 8/15 declaration window at years 56; renewal every 10 years.
## Documents
- [01-clearance.md](01-clearance.md) — the 2026-08-07 knockout search record: queries run, conflict screen results, the WORKLANE analysis, the crowded-field argument, and the filing plan (start here)
Documents are added as the sub-project progresses, numbered in sequence: filing record, office-action responses, registration, maintenance.